首页> 外文期刊>Hydro review >Small Hydro Construction In Alaska
【24h】

Small Hydro Construction In Alaska

机译:阿拉斯加的小型水力建筑

获取原文
获取原文并翻译 | 示例
           

摘要

Construction of one small hydroelectric project in Alaska is complete, and two more are being built. These three projects total 18 MW in capacity. Operation of these projects will eliminate the use of more than 2 million gallons of diesel fuel each year. Three hydroelectric projects are under construction or recently completed in Alaska: 800-kW Falls Creek, 3-MW Kasidaya Creek, and 14.3-MW Lake Dorothy. Development of these three projects is intended to offset the use of expensive diesel fuel. Together, these hydro projects are expected to produce more than 88,500 megawatt-hours of electricity each year to supply cities in southeastern Alaska.
机译:阿拉斯加的一个小型水力发电项目已完成建设,另外两个正在建设中。这三个项目的总装机容量为18兆瓦。这些项目的运营将消除每年使用超过200万加仑的柴油。阿拉斯加正在建设或近期完成三个水力发电项目:800千瓦的福尔斯克里特河,3兆瓦的卡西达亚河和14.3兆瓦的多萝西湖。这三个项目的开发旨在抵消昂贵柴油的使用。预计这些水电项目合计每年将产生88,500兆瓦时的电力,为阿拉斯加东南部的城市供电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号