首页> 外文期刊>Hydro review >Canada to pay C$72 million to 196-MW East Toba-Montrose
【24h】

Canada to pay C$72 million to 196-MW East Toba-Montrose

机译:加拿大将向196兆瓦东Toba-Montrose支付7200万加元

获取原文
获取原文并翻译 | 示例
           

摘要

The government of Canada is to pay a financial incentive worth as much as C$72.7 million (USS57.4 million) over ten years to the owners of the 123-MW East Toba River and 73-MW Montrose Creek hydroelectric project in British Columbia.rnThe federal government said it would provide the incentive from its CS1.48 billion (US$1.17 billion) ecoEnergy for Renewable Power Program. The program offers a C$10 (US$7.89) per rnmegawatt-hour (MWh) incentive for electricity produced by low-impact, renewable electricity projects for ten years after commissioning,rnEcoEnergy payments for East Toba River and Montrose Creek are capped at C$7.27 million (US$5.74 million) annually,- and C$72.7 million for the 10-ycar period.
机译:加拿大政府将在十年内向不列颠哥伦比亚省123兆瓦东托巴河和73兆瓦蒙特罗斯河水电项目的业主支付高达7270万加元(5740万美元)的财政奖励。联邦政府表示,将从其14.8亿瑞士法郎(11.7亿美元)的ecoEnergy可再生能源计划中提供奖励。该计划将为低影响力可再生电力项目投产十年后的每兆兆瓦时(MWh)提供10加元(7.89美元)的奖励,rn东Toba河和Montrose Creek的能源支付上限为727万加元(每年574万美元),以及10天车期的7,270万加元。

著录项

  • 来源
    《Hydro review》 |2009年第4期|74-74|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号