首页> 外文期刊>Hydro review >Jordanelle: Developing New Hydro At an Existing Dam
【24h】

Jordanelle: Developing New Hydro At an Existing Dam

机译:乔丹妮尔:在现有大坝上开发新的水电

获取原文
获取原文并翻译 | 示例
           

摘要

The CUWCD pre-qualified six contractors and, in August 2006, received bids from four, ranging from $10 million to $11.8 million. The engineer's estimate for the project was $8 million. CUWCD staff evaluated the increased cost of construction against the estimated project revenue and recommended to its board of trustees that the bids were responsive and responsible and that the project would still be financially successful. After Interior gave approval to award the construction contract, CUWCD awarded the $10 million contract to W.W. Clyde & Company of Springville, Utah, with a project completion date of April 30, 2008.
机译:CUWCD已对6个承包商进行了资格预审,并于2006年8月收到了4个承包商的投标书,投标额从1000万美元到1180万美元不等。工程师对该项目的估计为800万美元。 CUWCD的工作人员根据估计的项目收入评估了增加的建筑成本,并向其董事会建议,投标具有响应性和负责任性,并且该项目在财务上仍将成功。在内政部批准授予建筑合同后,CUWCD向W.W.授予了1000万美元的合同。犹他州斯普林维尔的克莱德公司,项目完成日期为2008年4月30日。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号