首页> 外文期刊>Hydro review >An Examination of Dam Failures vs. Age of Dams
【24h】

An Examination of Dam Failures vs. Age of Dams

机译:关于水坝破坏与水坝年龄的检验

获取原文
获取原文并翻译 | 示例
           

摘要

Some dam failures stem from long-term use, while other incidents are tied to earthquakes, floods, and other events. How are failures distributed over the life of a dam? And does a long period of satisfactory performance mean there will be no significant incident over the remainder of its life?rnDam safety professionals must be ever vigilant in their efforts to assure the safety of dams and other water retention or control structures under their charge; whether owner, regulator or consultant, none can be complacent when it comes to dam safety.
机译:一些大坝的故障是由于长期使用而引起的,而其他事件则与地震,洪水和其他事件有关。在大坝的使用寿命中如何分配故障?长期的令人满意的性能是否意味着在其余下的生命中不会发生重大事故?Dam安全专业人员必须时刻保持警惕,以确保所负责的大坝和其他保水或控制结构的安全;无论是所有者,监管者还是顾问,在大坝安全方面都不能沾沾自喜。

著录项

  • 来源
    《Hydro review》 |2010年第4期|P.62-6668|共6页
  • 作者

    Patrick J. Regan;

  • 作者单位

    Division of Dam Safety and Inspection, Federal Energy Regulatory Commission, Portland, Oregon;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号