首页> 外文期刊>Hydro review >FERC approves first hydro project under Colorado small hydro pact
【24h】

FERC approves first hydro project under Colorado small hydro pact

机译:FERC批准了科罗拉多小水电协定下的第一个水电项目

获取原文
获取原文并翻译 | 示例
           

摘要

The Federal Energy Regulatory Commission has approved a hydropower license exemption for the first small hydro project to apply pursuant to a pilot program established by a FERC memorandum of understanding with the state of Colorado.rnFERC issued an exemption Sept. 14 to George Wenschhof for the 23-kW Meeker Wenschhof project, to be built on an existing irrigation pipeline near Meeker, Colo. The project includes a powerhouse with one turbine-generator that is to generate 100,000 kWh annually.
机译:根据FERC与科罗拉多州达成的谅解备忘录建立的试点计划,联邦能源监管委员会已批准对第一个小型水电项目申请水电许可证。rnFERC于9月14日向George Wenschhof发出了23项豁免-kW Meeker Wenschhof项目,将在科罗拉多州Meeker附近的现有灌溉管道上建设,该项目包括一个带有一台涡轮发电机的发电站,每年可发电100,000 kWh。

著录项

  • 来源
    《Hydro review》 |2011年第8期|p.6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号