首页> 外文期刊>Hydro review >Unit at Barkley operating again after stator winding repair
【24h】

Unit at Barkley operating again after stator winding repair

机译:定子绕组维修后,巴克利机组再次运行

获取原文
获取原文并翻译 | 示例
           

摘要

A 32.5-MW turbine-generator unit at the 130-MW Barkley plant is now operating following repairs to generator stator windings that were damaged by a fire in December 2010. The information presented here was taken from a story written by Fred Tucker, public affairs specialist with the U.S. Army Corps of Engineers The facility is on the Cumberland River in Kentucky and is owned and operated by the Corps. Unit 1 was placed on line in 1966. The repair cost $11.5 million and began in August 2012.
机译:130兆瓦巴克利工厂的32.5兆瓦涡轮发电机组现在正在对2010年12月因大火而损坏的发电机定子绕组进行维修。美国陆军工程兵团的专家该设施位于肯塔基州的坎伯兰河上,由兵团拥有和运营。 1号机组于1966年投入生产。维修费用为1,150万美元,于2012年8月开始。

著录项

  • 来源
    《Hydro review》 |2014年第1期|112-112|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号