首页> 外文期刊>Hydro review >Developing 2,400+ MW of Hydro in North America
【24h】

Developing 2,400+ MW of Hydro in North America

机译:在北美发展超过2,400兆瓦的水电

获取原文
获取原文并翻译 | 示例
           

摘要

Building new hydropower is a significant commitment. Beyond the long timeline and headaches involved in getting an operating license and arranging equipment delivery, there's the massive financial responsibility. Even (relatively) small projects can cost serious money. This article provides details about development work ongoing (or completed in 2015) at 10 hydro projects in the U.S. and Canada.This is just a representative sample and not intended to be comprehen- sive. (For example, I know Innergex is also currently building the 25.3-MW Boulder Creek, 21.2-MW Tretheway Creek and 81.4-MW Upper Lillooet projects, in addition to the Big Silver Creek facility featured below.) The more than 2,450 MW of hydropower discussed below represents an investment of more than $ 18 billion … and dozens of years.
机译:建设新的水电是一项重大承诺。除了获得运营许可证和安排设备交付所需的漫长时间和头痛之外,还有巨大的财务责任。即使是(相对)小的项目也可能会花费大量资金。本文详细介绍了美国和加拿大的10个水电项目正在进行的开发工作(或将于2015年完成),这只是一个代表性示例,并不具有全面性。 (例如,我知道Innergex除了下面介绍的Big Silver Creek设施外,目前还在建设25.3兆瓦的博尔德溪,21.2兆瓦的特雷威河和81.4兆瓦的Lillooet项目。)超过2,450兆瓦的水电下文讨论的投资额超过180亿美元,而且需要数十年的时间。

著录项

  • 来源
    《Hydro review》 |2015年第9期|2022242628|共5页
  • 作者

    Elizabeth Ingram;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号