首页> 外文期刊>Hydro review >Canadian Spotlight
【24h】

Canadian Spotlight

机译:加拿大聚光灯

获取原文
获取原文并翻译 | 示例
       

摘要

Two of Hydro-Quebec's top leadership positions and a high-profile managerial assignment are changing. Chief Executive Officer and President Thierry Vandal, Executive Vice President-Corporate Affairs and Secretary General Marie-Jose Nadeau and Georges Abiad, project manager of Advanced Metering Infrastructure (AMI), are transitioning away from the Canadian government-owned utility. Abiad was responsible for implementing the company's C$1 billion AMI smart meter system. Hydro-Quebec said in a Feb. 3 press release that the rollout of the next-generation meters is progressing well and Abiad's departure will have no impact on the project's progress.
机译:魁北克水电局的两个最高领导职位和一个高调的管理职位正在发生变化。首席执行官兼总裁Thierry Vandal,企业事务执行副总裁兼秘书长Marie-Jose Nadeau和Advanced Metering Infrastructure(AMI)项目经理Georges Abiad正在从加拿大政府拥有的公用事业过渡。 Abiad负责实施公司10亿加元的AMI智能电表系统。魁北克水电公司在2月3日的新闻稿中表示,下一代电表的部署进展顺利,阿比亚德(Abiad)的离任不会对该项目的进度产生影响。

著录项

  • 来源
    《Hydro review》 |2015年第2期|68-69|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:03:58

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号