首页> 外文期刊>Hydro review >Issues have pushed back some hydro work for AMP
【24h】

Issues have pushed back some hydro work for AMP

机译:问题已使AMP的部分水力工程推迟

获取原文
获取原文并翻译 | 示例
       

摘要

Editor's Note:This content was originally featured on GenerationHub. com, a sister site of HydroWorld.com that covers power generation. Fitch Ratings on Nov. 21 said it has affirmed the 'A' rating on bonds that support three American Municipal Power Inc. (AMP) projects on the Ohio River. The Rating Outlook is Stable, Fitch noted. The bonds are secured by the trust estate, which will include all gross receipts (primarily payments made by the participants under power sales contracts), as well as other rights under the power sales contracts and transactional documents. This project consists of three run-of-the-river facilities aggregating 208 MW, located at U.S. Army Corps of Engineers dams. Once complete, the Cannelton, Smithland and Willow Island plants are expected to provide power supply that is expensive ($114/MWh) over the near term but environmentally-friendly.
机译:编者注:此内容最初是在GenerationHub上精选的。 com,这是HydroWorld.com的姊妹网站,内容涉及发电。惠誉国际评级在11月21日表示,已确认支持俄亥俄州河上三个美国市政电力公司(AMP)项目的债券的“ A”级评级。惠誉指出,评级展望是稳定的。债券由信托财产担保,其中包括所有总收入(主要是参与者根据电力销售合同所支付的款项),以及电力销售合同和交易文件中的其他权利。该项目由位于美国陆军工兵大坝的三个总装机容量为208 MW的过江设施组成。一旦完成,坎内尔顿,史密斯兰和柳岛的电厂有望在短期内提供昂贵的电力供应(114美元/兆瓦时),但对环境友好。

著录项

  • 来源
    《Hydro review》 |2015年第1期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:03:56

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号