【24h】

R&D Forum

机译:研发论坛

获取原文
获取原文并翻译 | 示例
       

摘要

The U.S. Department of the Interior with assistance from the Environmental Science Division (EVS) of the U.S. Department of Energy's Argonne National Laboratory completed the final environmental impact statement (EIS) for the Long-Term Experimental and Management Plan (LTEMP). This final EIS is a comprehensive evaluation of 1,312-MW Glen Canyon hydroelectric facility operations and its effects on the Colorado River through the Grand Canyon. This is the first such evaluation in more than 20 years, EVS says, and it examines flow regimes to meet the goals of supplying water for communities, agriculture and industry and will protect the resources of the Grand Canyon, while providing clean hy-dropower. Interior is expected to produce a record of decision incorporating data from the study that will identify how the department plans to operate Glen Canyon Dam for the next 20 years.
机译:美国内政部在美国能源部阿贡国家实验室的环境科学部(EVS)的协助下完成了长期实验和管理计划(LTEMP)的最终环境影响声明(EIS)。最终的EIS是对1,312兆瓦格伦峡谷水电站设施运营及其对通过大峡谷对科罗拉多河的影响的综合评估。 EVS说,这是20年来的首次此类评估,它研究了水流状况,以实现为社区,农业和工业供水的目标,并在提供清洁水力发电的同时保护大峡谷的资源。预计内政部将结合该研究的数据产生决策记录,以确定该部门计划在未来20年内如何运营Glen Canyon大坝。

著录项

  • 来源
    《Hydro review》 |2016年第10期|40-41|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:03:40

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号