A ging hydro facilities present challenges, and the hydro plant discussed in this article provides an illustration of how the life of such an aging unit can be extended. The facility is located on a river in a northeastern U.S. state that was home to a number of paper mills constructed during the early 20th century, many of which were converted to generate hydroelectric power. This mill was built in the early 1900s before being converted to electric power production in 1914, when three vertical Francis turbine-generator units were installed. The plant owner still operates three units with an installed capacity of 8 MW operating at 45 feet of head.
机译:老化的水力设施提出了挑战,本文讨论的水力发电厂说明了如何延长这种老化机组的寿命。该设施位于美国东北部的一条河流上,该河流是20世纪初期建造的许多造纸厂的所在地,其中许多造纸厂被转换成水力发电设备。该工厂建于1900年代初,在1914年转换为电力生产时,安装了三台立式混流式水轮发电机。电厂所有者仍在运行三台机组,装机容量为8兆瓦,运行高度为45英尺。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号