首页> 外文期刊>Hydro Review Worldwide >The Half-Speed Turbine
【24h】

The Half-Speed Turbine

机译:半速涡轮

获取原文
获取原文并翻译 | 示例
           

摘要

A large open pit mine was being built in the wilderness, along with a 120-MW, two-unit hydro plant to provide power for the electric shovels, ore crushing plant, and mine town. During the feasibility study for the hydro development, there was controversy because the two companies consulting on the project had markedly different optimum layouts. The controversy was resolved, and one consultant was engaged to produce the detailed engineering drawings for the hydro development, while the other was retained to act as the owner's engineer.
机译:正在野外建造一座大型露天矿,以及一座120兆瓦,两台机组的水力发电厂,为电铲,矿石破碎厂和矿山镇提供电力。在水电开发的可行性研究中,存在争议,因为两家咨询该项目的公司的最佳布局明显不同。争议解决了,聘请了一名顾问来为水电开发制作详细的工程图,而另一名则被聘为业主的工程师。