首页> 外文期刊>Hydro Review Worldwide >Ecuador Seeks Study, Design For 4,000-mw Zamora Complex
【24h】

Ecuador Seeks Study, Design For 4,000-mw Zamora Complex

机译:厄瓜多尔寻求研究,设计4000兆瓦Zamora综合大楼

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Ecuador's Ministry of Electricity and Renewable Energy plans to recruit consultants to perform studies and detailed design of the 4,000-MW Zamora hydroelectric complex on Ecuador's Zamora and Namangoza rivers. The ministry called Zamora the largest and most important hydroelectric development in Ecuador. The ministry seeks technical and economic pre-feasibility and feasibility studies as well as detailed design of the Zamora complex (Lower Course), which could include 20 hydroelectric projects, 90 percent of which would be in Morona Santiago Province. Although the budget allocated for the work is US$29.45 million, the ministry said it would invest US$40 million to complete the studies and final design. Funds are to come from Ecuador's energy and hydrocarbon investment fund, Fondo Ecuatoriano de Inversion en los Sectores Energetico e Hidrocarburifero.
机译:厄瓜多尔电力和可再生能源部计划招聘顾问,对厄瓜多尔Zamora河和Namangoza河上的4,000兆瓦Zamora水电综合设施进行研究和详细设计。该部称赞莫拉为厄瓜多尔最大,最重要的水力发电项目。该部寻求技术和经济上的前期可行性和可行性研究,以及Zamora联合体(下游课程)的详细设计,其中可能包括20个水力发电项目,其中90%位于圣地亚哥莫罗纳省。尽管分配给该项目的预算为2945万美元,但该部表示将投资4000万美元以完成研究和最终设计。资金将来自厄瓜多尔的能源和碳氢化合物投资基金,能源部门和能源部门。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号