...
首页> 外文期刊>Hydro Review Worldwide >Formal opening for 87 MW Paravani project
【24h】

Formal opening for 87 MW Paravani project

机译:87兆瓦Paravani项目正式开放

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Energy officials from Georgia and Turkey were on hand for the formal opening of the 87 MW Paravani project, being completed by Turkey's Andalou Group on Georgia's Paravani River. The European Bank for Reconstruction and Development (EBRD) hailed the event, in Samstkhle Javakheti Region near the Turkish border, after the bank lent US$54 million to Paravani, while the World Bank's International Finance Corp. (IFC) supplied a further US$40.5 million to the project. Another US$23 million for the project came from commercial bank loans.
机译:来自格鲁吉亚和土耳其的能源官员正在为87兆瓦Paravani项目的正式开工做准备,该项目由土耳其的Andalou集团在格鲁吉亚的Paravani河上完成。欧洲复兴开发银行(EBRD)在土耳其边境附近的萨姆斯赫勒爪哇地区向该活动提供了5400万美元的贷款,世界银行的国际金融公司(IFC)又提供了4050万美元,以示赞赏。到项目。该项目的另外2300万美元来自商业银行贷款。

著录项

  • 来源
    《Hydro Review Worldwide》 |2014年第6期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号