首页> 外文期刊>Highways >Multi-storey Car Park built in four days
【24h】

Multi-storey Car Park built in four days

机译:四天内建成的多层停车场

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The 400 tonne structure, half the size of a football pitch took only 4 days to build. It will provide an extra 73 car parking spaces for Asda at their Grimsby Supermarket. We were under instructions to have the structure completely erected on Thursday to cope with the additional car parking requirements of the weekend, said Frank Rothwell the Managing Director of Another Level Car Parks Ltd of Oldham. The all steel structure is to be used for temporary car parking for colleagues and contractors during the current refurbishment and extension of the (Asda) Super market.
机译:这座重达400吨的结构仅是足球场大小的一半,因此仅用了4天就完成了建造。它将在其Grimsby超市为Asda提供额外的73个停车位。奥德汉姆另一层停车场有限公司董事总经理弗兰克·罗斯威尔说,我们被指示要在周四完全竖立结构,以应付周末的额外停车要求。在(Asda)超级市场的​​当前翻新和扩建期间,全钢结构将用于同事和承包商的临时停车场。

著录项

  • 来源
    《Highways》 |2004年第7期|p.2224|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 公路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号