首页> 外文期刊>Heating & Ventilating Review >Boilers on duty at Leeds Castle
【24h】

Boilers on duty at Leeds Castle

机译:利兹城堡值班锅炉

获取原文
获取原文并翻译 | 示例
           

摘要

MHS Boilers has supplied three 85kW Thision L boilers complete with a matched cascade frame and connection set, cascade controls, Pisces pressurisation unit and a Gemini 300i high output calonfier to Leeds Castle in Maidstone, Kent. The boilers were fitted in the boiler house serving the stable courtyard bedrooms and garden house, as part of an upgrade of the holiday accommodation at the site. The installation is the first part of an ongoing scheme to reduce fuel costs and improve hot water delivery at Leeds Castle. The new boiler system was designed and installed by Rochester-based heating company HOB Mechanical Services.
机译:MHS锅炉公司已为肯特州梅德斯通的利兹城堡提供了三台85kW的Thision L锅炉,这些锅炉配有相配的叶栅框架和连接装置,叶栅控制装置,双鱼座增压装置和Gemini 300i高输出校准仪。锅炉安装在锅炉房中,该锅炉房为稳定的庭院卧室和花园房提供服务,这是该场所度假住宿升级的一部分。安装是正在进行的计划的第一部分,该计划旨在降低燃料成本并改善利兹城堡的热水输送。新锅炉系统是由位于罗切斯特的供热公司HOB Mechanical Services设计和安装的。

著录项

  • 来源
    《Heating & Ventilating Review》 |2012年第12期|p.35|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号