...
首页> 外文期刊>Greenwire >Protest held over Honolulu park construction resumption
【24h】

Protest held over Honolulu park construction resumption

机译:檀香山公园建设恢复举行抗议

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

About 20 protesters gathered in Honolulu after the city announced plans to resume construction of a new multipurpose field in a park known as Sherwood Forest. Honolulu Mayor Kirk Caldwell announced Sunday on social media that construction would resume at Waimanalo Bay Beach Park on Monday. Opponents of the project gathered at the park entrance Monday despite an email from the group Save Our Sherwoods asking residents to observe stay-at-home restrictions aimed at preventing the spread of the novel coronavirus. City officials said in January they intended to continue with the first phase of the project to develop a section of the Waimanalo park, also called Sherwood Forest. "While there's been a lot of emotion around the project, I think it's everyone's hope at the end of the day when this field is completed ... people can gather here," Caldwell said in the online video statement. The resumption of construction is a blow to community members who have opposed the $1.43 million development project at the park since last year. The project was put on hold after 28 people were arrested trying to block construction in September.
机译:檀香山市宣布计划恢复在名叫舍伍德森林(Sherwood Forest)的公园建设新的多用途场地后,大约20名抗议者聚集在檀香山。檀香山市市长柯克·考德威尔(Kirk Caldwell)周日在社交媒体上宣布,周一将在威玛纳诺湾海滩公园恢复建设。尽管“拯救我们的舍伍德”组织的一封电子邮件要求居民遵守旨在防止新型冠状病毒传播的居家限制措施,但该项目的反对者周一仍在公园入口处聚集。市政府官员在1月份表示,他们打算继续该项目的第一阶段,以开发Waimanalo公园的一部分,也称为Sherwood森林。卡尔德威尔在在线视频声明中说:“尽管对该项目充满了热情,但我认为这是每个人在田野完工时的希望……人们可以聚集在这里。”自去年以来,反对建造该公园的143万美元开发项目的社区成员对建筑的恢复是一个打击。 9月,有28人因试图阻止建筑施工而被捕,该项目被搁置。

著录项

  • 来源
    《Greenwire》 |2020年第8期|17-18|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号