首页> 外文期刊>Geothermics >Thermoeconomic cost analysis and comparison of methodologies for Dora Ⅱ binary geothermal power plant
【24h】

Thermoeconomic cost analysis and comparison of methodologies for Dora Ⅱ binary geothermal power plant

机译:朵拉Ⅱ二元地热发电厂热经济成本分析与方法比较。

获取原文
获取原文并翻译 | 示例
           

摘要

Three thermoeconomic methodologies, specific exergy costing (SPECO), modified productive structure analysis (MOPSA) and the Moran, were used to compare cost flows and products interactions between system components in the context of an existing binary geothermal power plant in western Turkey. With the objective of identifying advantages and disadvantages, exergy and exergoeconomic analyses were conducted using actual plant data to evaluate plant performances and thermoeconomic costs. Overall energy and exergy efficiencies of the plant were calculated as 13.5% and 47.3% and unit exergetic electricity costs were determined as 0.0436 $/kWh for MOPSA, 0.0367 $/kWh for SPECO and 0.0355 $/kWh for Moran.
机译:在土耳其西部现有的二元地热发电厂的背景下,使用三种热经济学方法,比火用成本法(SPECO),改进的生产结构分析(MOPSA)和Moran来比较系统组件之间的成本流和产品相互作用。为了确定优点和缺点,使用实际工厂数据进行了火用和能效分析,以评估工厂的性能和热经济成本。电厂的总能源和火用效率分别为13.5%和47.3%,单位高能用电成本确定为:MOPSA为0.0436 $ / kWh,SPECO为0.0367 $ / kWh,Moran为0.0355 $ / kWh。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号