Jute-high density polyethylene (HDPE) blended geotextile samples produced using HDPE slit-film in the machine direction and jute yarn in the cross direction for use in the construction of unpaved rural roads. Use of HDPE slit-film resulted in high productivity of jute-based geotextiles in modern high-speed machines, while jute (≈ 85%) in cross direction resulted in notable increase in modulus, breaking strength, CBR puncture resistance of the blended geotextile as compared to 100% HDPE geotextile. The optimized geotextile (plain-weave fabric with 111 tex HDPE in machine direction, 2 × 360 tex jute yarn in cross direction having area density, 316 g/m~2) was used in a field trial. During road construction, the geotextile was covered with a layer of 10 cm thick laterite gravels as the sub-grade, compacted by rolling, and then finally covered with 10 cm small granular lateritic stones, and rolled again. The field trial showed that the monitored section where geotextile was used showed an even surface without any notable subsidence or rutting after 18 months. However in sections of the road constructed without the geotextile, 5-35 mm deep ruts were observed. CBR tests (carried out 11 months and 18 months after construction) showed a 67-73% improvement in the road due to the use of jute-HDPE blended geotextile than that obtained for the part of the road where geotextiles were not used.
机译:黄麻高密度聚乙烯(HDPE)混纺土工布样品,使用高密度聚乙烯(HDPE)裂膜在纵向上生产,而黄麻纱线在横向上用于未铺设的农村公路。使用HDPE裂膜可在现代高速机器中提高黄麻基土工布的生产率,而横向的黄麻(≈85%)则可显着提高混合土工布的模量,断裂强度和CBR耐穿刺性与100%HDPE土工布相比。在现场试验中使用了优化的土工织物(在机器方向上具有111 tex HDPE,在横向上具有2×360 tex黄麻纱线,面积密度为316 g / m〜2的平纹织物)。在筑路过程中,土工布被一层10厘米厚的红土砾石覆盖,通过碾压压实,然后最终被10厘米小粒状红土石覆盖,然后再次碾压。现场试验表明,使用土工布的监测断面在18个月后显示出平坦的表面,没有任何明显的沉降或车辙。但是,在没有土工布的路段中,观察到了5-35 mm深的车辙。 CBR测试(施工后11个月和18个月进行)显示,与未使用土工布的那部分道路相比,使用黄麻-HDPE混合土工布使道路改善了67-73%。

著录项

  • 来源
    《Geotextiles and Geomembranes》 |2009年第6期|506-512|共7页
  • 作者单位

    National Institute of Research on Jute & Allied Fibre Technology, 12 Regent Park, Kolkata 700040, India;

    National Institute of Research on Jute & Allied Fibre Technology, 12 Regent Park, Kolkata 700040, India;

    National Institute of Research on Jute & Allied Fibre Technology, 12 Regent Park, Kolkata 700040, India;

    Institute of Jute Technology, 35 Ballygunge Circular Road, Kolkata 700019, India;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    geotextile; HDPE; jute; unpaved road; blended fabric; weaving;

    机译:土工布;高密度聚乙烯黄麻;未铺砌的路;混纺面料织造;
  • 入库时间 2022-08-18 00:13:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号