An approach to shorten the construction period of high embankment on soft soil improved with PVD

机译:PVD改善软土高路堤施工周期的方法

获取原文
获取原文并翻译 | 示例
       

摘要

Prefabricated Vertical Drains (PVDs) are being used to accelerate the consolidation of subsoil for construction of high embankment on soft ground. The construction is carried out in stages and height of the first stage construction depends on in-situ undrained shear strength. Each subsequent stage construction is carried out after completion of either 90% primary consolidation or percent consolidation at inflection point. The height of subsequent stages depends upon the gain in undrained strength of subsoil. In this paper, the authors have advocated an approach to shorten the construction period for high embankments. In this approach, the first stage construction would be carried out based on the in-situ undrained shear strength of subsoil. Instead of waiting for 90% primary consolidation or percent consolidation at inflection point, the embankment is raised in layers of 0.2 m thickness. Based on the time required to gain strength with the construction of the 0.2 m layer, the waiting period is determined for each subsequent layers. The waiting period depends on soil parameters such as subsoil thickness, C_r/ C_v ratio and different PVD factors viz. smear, drain spacing and well resistance, pattern of laying of PVD, etc. Using this approach, there would be increase in the consolidation rate and overall reduction in the construction period. A typical practical example has been solved to demonstrate the usefulness of this approach over the two conventional methods. For a 4.5 m high embankment, it is observed that waiting period is reduced by 77% and 43% as compared to the 90% primary consolidation method and inflection point method respectively.
机译:预制垂直排水装置(PVD)用于加速软土地基上高路堤施工的地基固结。施工是分阶段进行的,第一阶段施工的高度取决于原地不排水的剪切强度。在拐点处完成90%的初步固结或固结百分比后,进行每个后续阶段的构建。后续阶段的高度取决于地下土壤不排水强度的增加。在本文中,作者提出了一种缩短高路堤施工周期的方法。在这种方法中,第一阶段的施工将基于地下土壤的原地不排水抗剪强度。路堤不是在拐点处等待90%的初步固结或固结百分比,而是以0.2 m的厚度抬高。根据0.2 m层的构造获得强度所需的时间,确定每个后续层的等待时间。等待时间取决于土壤参数,例如地下土壤厚度,C_r / C_v比和不同的PVD因子。涂污,排水孔间距和井阻力,PVD的铺设方式等。使用这种方法,固结率将增加,施工周期将整体减少。解决了一个典型的实际示例,以证明该方法相对于两种常规方法的有用性。对于高4.5 m的路堤,与90%的一次固结法和拐点法相比,等待时间分别减少了77%和43%。

著录项

  • 来源
    《Geotextiles and Geomembranes》 |2009年第6期|488-492|共5页
  • 作者单位

    Geotechnical Engineering Division, Central Road Research Institute, Delhi-Mathura Road, New Delhi 110020, India;

    Geotechnical Engineering Division, Central Road Research Institute, Delhi-Mathura Road, New Delhi 110020, India;

    Geotechnical Engineering Division, Central Road Research Institute, Delhi-Mathura Road, New Delhi 110020, India;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    embankment; soft clay; layer; stage construction; inflection point; prefabricated vertical drain;

    机译:堤;软粘土层;阶段建设;拐点;预制垂直排水;
  • 入库时间 2022-08-18 00:13:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号