...
首页> 外文期刊>Geotechnical Fabrics Report >The landfill caps of Gin Drinker's Bay
【24h】

The landfill caps of Gin Drinker's Bay

机译:杜松子酒饮酒者海湾的垃圾填埋场

获取原文
获取原文并翻译 | 示例

摘要

Gin Drinker's Bay Landfill, Hong Kong, ceased operations in 1979. The site did not have a lining system and existing subsoil drains were largely ineffective in intercepting migrating leachate. When a 250 m (820 ft.) stretch of railway needed to be built through a portion of the closed landfill site, numerous geosynthetic protections were needed. The rail line provided an important connection between the new airport at Chek Lap Kok and the city. The waste needing to be crossed, however, presented numerous challenges. Any concrete foundations built into the waste would have been susceptible to constant aggressive attack. Measures to . minimize the project's environmental impact and provide protection to the viaduct's concrete piles had to be considered when excavation and construction began.
机译:香港金杜勒湾垃圾填埋场于1979年停止运营。该场地没有衬砌系统,现有的地下排污渠在拦截迁移的渗滤液方面效果不佳。当需要通过封闭的垃圾填埋场的一部分修建一条250 m(820 ft。)的铁路时,需要大量的土工合成材料保护。铁路线为赤La角新机场和市区之间提供了重要的连接。然而,需要穿越的废物提出了许多挑战。废物中内置的任何混凝土基础都容易受到持续的攻击。采取措施。在开挖和施工开始时,必须考虑将项目对环境的影响降至最低,并为高架桥的混凝土桩提供保护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号