CCR landfill final cover test pad-Part 1

机译:CCR垃圾填埋最终盖盖测试垫 - 第1部分

获取原文
获取原文并翻译 | 示例
           

摘要

An integrated drainage system (IDS) geomembrane, which provides both a low-permeability membrane and drainage space above the geomembrane, is being used in the final cover at a coal combustion residuals (CCR) landfill in West Virginia. Part 1 of this article presents construction in 2016 of the test pad (Figure 1) to evaluate 1-inch (2.5-cm) maximum subgrade protrusions beneath the geomembrane, placement of cover soil with a 9-inch (22.9-cm) maximum particle size using a low ground pressure (LGP) dozer, and the condition of the geosynthetics. Part 2 of this article will present the application of heavy traffic loads over the benched portion of the test pad to evaluate its use as a temporary haul road (in 2016), and additional exhumation of the test pad in 2018. GAI Consultants Inc. (GAI) is the engineer of record for an active landfill located in West Virginia and owned by a North American electric utility company. The landfill is permitted for disposal of fly ash, bottom ash and synthetic gypsum by the West Virginia Department of Environmental Protection (WVDEP). The approximate surface area of the completed landfill will be 192 acres (77.7 ha).
机译:一种集成的排水系统(IDS)土工膜,它在西弗吉尼亚州西弗吉尼亚州的煤炭燃烧残余物(CCR)垃圾填埋场的最终盖上提供了低渗透性膜和排水空间。本文第1部分在2016年的测试垫(图1)中提出了施工(图1),以评估土工膜下方1英寸(2.5厘米)的总路基突起,用9英寸(22.9厘米)最大颗粒的盖土尺寸使用低地压(LGP)Dozer,以及地质合成的条件。本文的第2部分将在测试垫的支架部分上展示繁忙的交通负荷,以评估其作为临时运输路(2016年)的用途,以及2018年的测试垫的额外挖掘。GAI顾问公司( GAI)是位于西弗吉尼亚州西弗吉尼亚州的活跃垃圾填埋场的记录工程师,由北美电器公用事业公司拥有。允许垃圾填埋场处理西弗吉尼亚州环保(WVDEP)的粉煤灰,底灰和合成石膏处理。完成的垃圾填埋场的近似表面积将是192英亩(77.7公顷)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号