首页> 外文期刊>Geomechanics and engineering >Limit analysis of a shallow subway tunnel with staged construction
【24h】

Limit analysis of a shallow subway tunnel with staged construction

机译:分阶段施工浅层地铁隧道的极限分析

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a limit analysis of the series of construction stages of shallow tunneling method by investigating their respective safety factors and failure mechanisms. A case study for one particular cross-section of Beijing Subway Line 7 is undertaken, with a focus on the effects of multiple soil layers and construction sequencing of dual tunnels. Results show that using the step-excavation technique can render a higher safety factor for the excavation of a tunnel compared to the entire cross-section being excavated all at once. The failure mechanisms for each different construction stage are discussed and corresponding key locations are suggested to monitor the safety during tunneling. Simultaneous excavation of dual tunnels in the same cross-section should be expressly avoided considering their potential negative interactions. The normal and shear forces as well as bending moment of the primary lining and locking anchor pipe are found to reach their maximum value at Stage 6, before closure of the primary lining Designing these struts should consider the effects of different construction stages of shallow tunneling method.
机译:本文通过研究浅埋隧道法各阶段的安全系数和破坏机理,提出了一系列的极限分析方法。以北京地铁7号线的一个特定横截面为例,重点研究了多层土层的影响和双隧道的施工顺序。结果表明,与一次开挖整个断面相比,采用阶梯开挖技术可以为隧道开挖提供更高的安全系数。讨论了每个不同施工阶段的破坏机理,并建议了相应的关键位置以监控隧道施工期间的安全性。考虑到潜在的负面影响,应明确避免在相同横截面上同时开挖双隧道。在关闭第一层衬砌之前,第一层衬砌和锁定锚管的法向力和剪力以及弯矩在第6阶段达到最大值。设计这些支杆时应考虑浅埋隧道法不同施工阶段的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号