首页> 外文期刊>Generation, Transmission & Distribution, IET >Subsynchronous oscillation and its practical mitigation project at the Hulun Buir power plant generating for a Chinese extra-high-voltage AC and DC hybrid transmission network
【24h】

Subsynchronous oscillation and its practical mitigation project at the Hulun Buir power plant generating for a Chinese extra-high-voltage AC and DC hybrid transmission network

机译:呼伦贝尔发电厂的次同步振荡及其在中国超高压交直流混合输电网络中的缓解措施

获取原文
获取原文并翻译 | 示例
           

摘要

In China, subsynchronous oscillation (SSO) appears continually at the Hulun Buir (HB) power plant, which is part of the extra-high-voltage (EHV) AC and DC hybrid transmission networks from the HB League power base to the Northeast. Related closely to the power delivered by the EHVDC link, these oscillations lead to fatigue accumulation, life-time reductions and even failures in the turbogenerators at the HB power plant. After a study of the oscillations, an inverse energy injection method is proposed to suppress the SSO phenomenon. According to the method, a bulk power electronic device is developed that is based on a multilevel voltage source converter to generate inverse energy. The mitigation device is implemented at the HB power plant. Field tests are conducted, and the results demonstrate that the device can depress SSO to levels that exceed the requirements, proving the effectiveness of the mitigation device.
机译:在中国,呼伦贝尔(HB)电厂不断出现次同步振荡(SSO),该电厂是从HB联盟电力基地到东北地区的超高压(EHV)交流和直流混合输电网络的一部分。这些振荡与EHVDC链路提供的功率密切相关,导致HB电厂涡轮发电机的疲劳累积,寿命减少甚至故障。在研究了振荡之后,提出了一种反向能量注入方法来抑制SSO现象。根据该方法,开发了基于多级电压源转换器以产生逆能量的大功率电子设备。缓解设备安装在HB电厂。进行了现场测试,结果表明该设备可以将SSO降低到超出要求的水平,从而证明了缓解设备的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号