首页> 外文期刊>Generation, Transmission & Distribution, IET >Risk based multi-objective dynamic expansion planning of sub-transmission network in order to have eco-reliability, environmental friendly network with higher power quality
【24h】

Risk based multi-objective dynamic expansion planning of sub-transmission network in order to have eco-reliability, environmental friendly network with higher power quality

机译:基于风险的子传输网络多目标动态扩展规划,以具有生态可靠性高,电能质量高,环境友好的网络

获取原文
获取原文并翻译 | 示例
           

摘要

This study suggests a method based on stochastic multi-objective modelling for optimally timing, siting and sizing of sub-transmission substationsand medium voltage feeders, distributed generations and capacitors, simultaneously, in order to take more pros of recent developed technologies. Regards to comprehensive impact of uncertainties including: intermittent nature of renewable energy sources, load forecasting and market price errors, some strategies must be devised in order to well incorporate them into the problem. The mentioned problem is modelled by dynamic programming which NSGA-2 is chosen for optimisation purposes and then fuzzy set theory is applied to find the best compromise solution. The proposed scheme aims to minimise substations expansion and installation cost, medium voltage feeders installation and replacement cost, DG units installation and operation cost, capacitors installation cost, cost of purchased energy from the transmission network, active and reactive power losses cost, and connection cost of sub-transmission substations to the upstream network. Besides, risk based modelling of energy not-supplied as an efficient reliability index is incorporated to cost function in order to improve the reliability of the network. Also voltage deviation and voltage stability as the criterion of power quality in distribution networks and emission reduction are treated as independent objective functions.
机译:这项研究提出了一种基于随机多目标建模的方法,可以同时优化变电站,中压馈线,分布式发电机和电容器的时序,选址和选型,以充分利用最新技术的优势。关于不确定性的综合影响,包括:可再生能源的间歇性,负荷预测和市场价格误差,必须设计一些策略以将其很好地纳入问题中。所提到的问题是通过动态规划建模的,其中动态规划选择了NSGA-2进行优化,然后应用模糊集理论来找到最佳折衷解决方案。拟议的方案旨在最小化变电站的扩展和安装成本,中压馈线的安装和更换成本,DG装置的安装和运行成本,电容器的安装成本,从传输网络购买的能源成本,有功和无功损耗成本以及连接成本到上游网络的子传输变电站。此外,未提供作为有效可靠性指标的基于风险的能源建模,以将其作为成本函数,以提高网络的可靠性。另外,将电压偏差和电压稳定性作为配电网络中电能质量的标准,并将排放量减少作为独立的目标函数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号