...
首页> 外文期刊>Fusion Engineering and Design >A review of JET neutral beam system performance 1994-2003
【24h】

A review of JET neutral beam system performance 1994-2003

机译:1994-2003年JET中性射束系统性能回顾

获取原文
获取原文并翻译 | 示例

摘要

The operational performance of the JET neutral beam injector (NBI) system during 2003 is presented and compared with NBI operation from 1994 to 2002. The paper also addresses different demands imposed on NBI operation during the JET Joint Undertaking (until the end of 1999) and the European Fusion Development Agreement (EFDA) JET operating contract (from 2000). The material presented shows new operational performance records achieved in 2003, derived from data focused on average and maximum pulse lengths, pulse power and injected pulse energy. Over the last 10 years, the issue of JET NBI positive ion neutral injector (PINI) reliability and availability has also been of significant interest. A discussion is presented where terminology is defined, technical systems causing unreliability and non-availability are analysed and operational practices are reviewed. The performance analysis shows that during the period of JET operation under the EFDA contract, the NBI facility has successfully changed from high power-short pulse to high power-long pulse (10 s) operation. It also shows that the sources of unreliability and non-availability have largely remained constant during this change.
机译:介绍了JET中性射束注入器(NBI)系统在2003年的运行性能,并将其与1994年至2002年的NBI运行进行了比较。本文还讨论了JET联合事业(直到1999年底)对NBI运行施加的不同要求,以及欧洲融合发展协议(EFDA)JET运营合同(自2000年起)。所提供的材料显示了2003年取得的新的运行性能记录,这些记录来自于侧重于平均和最大脉冲长度,脉冲功率和注入脉冲能量的数据。在过去的十年中,JET NBI阳离子中性喷射器(PINI)的可靠性和可用性问题也引起了人们的极大关注。在讨论中定义了术语,分析了导致不可靠性和不可用性的技术系统,并审查了操作实践。性能分析表明,在按照EFDA合同进行JET操作期间,NBI设备已成功从高功率短脉冲转换为高功率​​长脉冲(10 s)。它还表明,在此更改期间,不可靠性和不可用性的来源在很大程度上保持不变。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号