首页> 外文期刊>Fusion Engineering and Design >ITER remote maintenance system configuration model overview
【24h】

ITER remote maintenance system configuration model overview

机译:ITER远程维护系统配置模型概述

获取原文
获取原文并翻译 | 示例
           

摘要

A challenge for the ITER project is to manage the design of many systems being developed in parallel. In order to control the machine configuration and ensure proper design integration, the ITER project has implemented the so-called"configuration management models" (CMMs), aimed at controlling and managing the machine systems' interfaces. Specific issues are raised for modelling the ITER remote maintenance system (IRMS). That system shall provide the mean to support the remote maintenance operations for in-vessel components, remote transfer of activated components between the vacuum vessel (W) and the hot cell facility and remote repairing, refurbishing and/or processing operations in the hot cell facility. The IRMS are dynamic, constantly changing morphologies, working envelopes and locations within the plant. This raises the issue of how to integrate the dynamic nature of this equipment into the CMM required for design integration. This paper describes the design methodology that is being developed to address the specific nature of the IRMS in the building of the CMM and gives examples to demonstrate the benefits to be gained by adopting this approach.
机译:ITER项目面临的挑战是管理许多并行开发的系统的设计。为了控制机器配置并确保适当的设计集成,ITER项目实施了所谓的“配置管理模型”(CMM),旨在控制和管理机器系统的界面。针对ITER远程维护系统(IRMS)的建模提出了一些具体问题。该系统应提供手段来支持容器内组件的远程维护操作,在真空容器(W)和热室设备之间远程激活的组件的转移以及热室设备中的远程维修,翻新和/或处理操作。 IRMS是动态的,并且在工厂中不断变化的形态,工作范围和位置。这就提出了一个问题,即如何将该设备的动态特性集成到设计集成所需的CMM中。本文描述了正在开发的设计方法,以解决CMM构建过程中IRMS的特殊性质,并举例说明采用这种方法将获得的好处。

著录项

  • 来源
    《Fusion Engineering and Design》 |2011年第11期|p.1903-1906|共4页
  • 作者单位

    ITER Organization. CS 90 046, 13067 St. Paul Lez Durance Cedex, France;

    ITER Organization. CS 90 046, 13067 St. Paul Lez Durance Cedex, France;

    ITER Organization. CS 90 046, 13067 St. Paul Lez Durance Cedex, France;

    ITER Organization. CS 90 046, 13067 St. Paul Lez Durance Cedex, France;

    ITER Organization. CS 90 046, 13067 St. Paul Lez Durance Cedex, France;

    ITER Organization. CS 90 046, 13067 St. Paul Lez Durance Cedex, France;

    ITER Organization. CS 90 046, 13067 St. Paul Lez Durance Cedex, France;

    ITER Organization. CS 90 046, 13067 St. Paul Lez Durance Cedex, France;

    ITER Organization. CS 90 046, 13067 St. Paul Lez Durance Cedex, France;

    ITER Organization. CS 90 046, 13067 St. Paul Lez Durance Cedex, France;

    ITER Organization. CS 90 046, 13067 St. Paul Lez Durance Cedex, France;

    Fusion for Energy. c/Josep Pla n.2, Torres Diagonal Litoral B3 - 9th Floor, 08019 Barcelona, Spain;

    Fusion for Energy. c/Josep Pla n.2, Torres Diagonal Litoral B3 - 9th Floor, 08019 Barcelona, Spain;

    Fusion for Energy. c/Josep Pla n.2, Torres Diagonal Litoral B3 - 9th Floor, 08019 Barcelona, Spain;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    ITER; maintenanceremote handling; design integration;

    机译:ITER;维护远程处理;设计整合;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号