首页> 外文期刊>Food Manufacture >Cider factory overhaul makes strong progress
【24h】

Cider factory overhaul makes strong progress

机译:苹果酒工厂大修进展顺利

获取原文
获取原文并翻译 | 示例
           

摘要

Heineken's Bulmers cider plant in Hereford is making strong headway through an added value turnaround plan, which has already yielded significant site benefits. "We're going through a change management plan," said training manager Marcus Billig.'The plan was launched in 2009 when we carefully reviewed manufacturing efficiency.This included ensuring the group's assets were maximised and bottling line capacity was transferred to Tadcaster." A core pillar of the strategy, which has involved stringent cost savings, has been the implementation of total productive management (TPM) to supervise total productive maintenance. TPM has included training operations personnel to equip them to perform basic maintenance tasks previously performed by engineers.
机译:喜力在赫里福德的Bulmers苹果酒工厂正在通过增值周转计划取得强劲进展,该计划已经产生了可观的现场收益。培训经理Marcus Billig说:“我们正在制定一项变更管理计划。该计划于2009年启动,当时我们仔细审查了生产效率,其中包括确保使集团的资产最大化,并将装瓶线的产能转移到Tadcaster。”该战略的核心支柱是节省大量成本,其中包括实施全面生产管理(TPM)以监督全面生产维护,TPM包括培训操作人员以使他们能够执行工程师以前执行的基本维护任务。

著录项

  • 来源
    《Food Manufacture》 |2011年第11期|p.5|共1页
  • 作者

    ROD ADDV;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号