...
首页> 外文期刊>Flight international >Final Assembly Begins Of Sixth And Last 787 Flight-test Airframe
【24h】

Final Assembly Begins Of Sixth And Last 787 Flight-test Airframe

机译:总装第六和最后一架787飞行试验机

获取原文
获取原文并翻译 | 示例
           

摘要

Roeing has started assembling the sixth and last 787 flight-test airframe and now has 25 more Dreamliners in various stages of production. The sixth flight-test aircraft, dubbed "ZA006", is the second and final flight-test airframe powered by the General Electric GEnx-lB engine. The other four are powered by the Rolls-Royce Trent 1000.rnBoeing confirms that production work is continuing on ZA003, ZA004 and ZA005, with ZA001 having entered the paint-shop and power-on initiated for ZA002 in late February.rnBoeing's latest 787 programme schedule calls for completing the first flight in the second quarter of this year and first delivery in the first quarter of 2010.
机译:Roeing已开始组装第六架也是最后一架787飞行试验机体,现在在生产的各个阶段又增加了25架Dreamliner。第六架名为“ ZA006”的飞行测试飞机是第二架也是最后一架由通用电气GEnx-lB发动机提供动力的飞行测试飞机。另外四架由劳斯莱斯Trent 1000提供动力。波音公司确认ZA003,ZA004和ZA005的生产工作仍在继续,ZA001进入喷漆车间并于2月下旬启动ZA002的通电。rnBoeing最新的787计划日程安排要求在今年第二季度完成首飞,并在2010年第一季度完成首批交付。

著录项

  • 来源
    《Flight international》 |2009年第5182期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号