首页> 外文期刊>Flight international >P&W to tackle V2500 spares shortage
【24h】

P&W to tackle V2500 spares shortage

机译:P&W解决V2500备件短缺

获取原文
获取原文并翻译 | 示例
           

摘要

Pratt & Whitney intends to resolve a spare-parts shortage for International Aero Engines (IAE) V2500s through expanded manufacturing capacity and increased spare-engine availability. The manufacturer - which supplies the V2500's high-pressure turbine (HPT), and also owns, through parent UTC, nearly 50% of IAE - says it has experienced "shortages" of first- and second-stage disks in the two-stage HPT. This, P&W adds, is a result of an "identified manufacturing shortcoming from a supplier". Sources within the V2500 leasing and maintenance sectors tell FlightGlobal that the parts shortage has prolonged shop visits and consequently led to a rise in short-term engine lease rates as demand for spare engines increases.
机译:普惠公司打算通过扩大制造能力和增加备用发动机的可用性来解决国际航空发动机(IAE)V2500的零件短缺问题。该制造商-提供V2500的高压涡轮(HPT),并且还通过其母公司UTC拥有近50%的IAE-说,在两级HPT中,第一级和第二级磁盘“短缺” 。 P&W补充说,这是“供​​应商明确的制造缺陷”的结果。 V2500租赁和维护部门的消息人士告诉FlightGlobal,零件短缺使工厂访问时间延长,因此,随着对备用发动机的需求增加,短期发动机租赁率也有所上升。

著录项

  • 来源
    《Flight international》 |2016年第5546期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号