首页> 外文期刊>Flight international >Tianjin assembly line will deliver Neo in late 2017
【24h】

Tianjin assembly line will deliver Neo in late 2017

机译:天津装配线将于2017年底交付Neo

获取原文
获取原文并翻译 | 示例
           

摘要

Airbus plans to deliver the first A320neo from its Tianjin final assembly line during the fourth quarter of 2017, having struck a tentative deal with the Chinese government to foster co-operation with suppliers in the country. The manufacturer says it could hand over the aircraft from October, but points out that the delivery schedule will ultimately be determined by the customer. Earlier this year, Airbus indicated that A320neo assembly would begin in Tianjin around mid-year, and at its US site in Mobile, Alabama, by year-end.
机译:空客计划在2017年第四季度从其天津总装线交付首架A320neo,并与中国政府达成了一项初步协议,以促进与该国供应商的合作。制造商表示,它将从10月起交出飞机,但指出交货时间表最终将由客户决定。空中客车公司今年初表示,A320neo组装将于年中左右在天津开始,并于年底在美国阿拉巴马州莫比尔的工厂开始组装。

著录项

  • 来源
    《Flight international》 |2017年第5591期|18-18|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号