首页> 外文期刊>Fire Technology >Large Scale Tunnel Fire Tests with Large Droplet Water-Based Fixed Fire Fighting System
【24h】

Large Scale Tunnel Fire Tests with Large Droplet Water-Based Fixed Fire Fighting System

机译:大水滴水基固定灭火系统的大型隧道火灾测试

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents the main results of six large scale fixed fire fighting system tests that were carried out in the Runehamar tunnel in September 2013. It describes the background and the performance of the system. The main fire load consisted of 420 standardized wood pallets and a target consisting of a pile of 21 wood pallets placed 5 m from the rear end of the main fire load. The purpose was to investigate possible fire spread. The water spray system is a deluge zone system delivering 10 mm/min in the activated zone. The detection system was simulated with use of thermocouple in the tunnel ceiling. The alarm was registered when the ceiling gas temperature was 141A degrees C. After alarm was obtained the system was activated manually after a given delay time that was varied in the tests. The heat release rates in tests with fire suppression were reduced to 20-45 MW compared to 100 MW estimated for a free-burn test or 75 MW in test 6 with a failure of activation. Fire spread to the target was prevented after fire suppression.
机译:本文介绍了2013年9月在Runehamar隧道中进行的六次大规模固定式消防系统测试的主要结果。它描述了该系统的背景和性能。主要火灾负荷包括420个标准木板,目标是一堆21个木板,距离主要火灾后端5 m。目的是调查可能的火势蔓延。喷水系统是一个雨淋区系统,在激活区的流速为10 mm / min。该探测系统是通过在隧道顶棚中使用热电偶来模拟的。当天花板气体温度为141A摄氏度时,会记录警报。获得警报后,系统会在给定的延迟时间(在测试中有所变化)后手动激活。在具有灭火功能的测试中,放热速率降低至20-45 MW,而对于自由燃烧测试,其放热速率估计为100 MW;在激活失败的测试6中,其放热速率为75 MW。灭火后,可防止火势蔓延至目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号