...
首页> 外文期刊>Fire Prevention & Fire Engineers Journal >High rise fire safety repairs'could take years'
【24h】

High rise fire safety repairs'could take years'

机译:高层消防安全维修可能需要数年的时间

获取原文
获取原文并翻译 | 示例

摘要

A GOVERNMENT document on fire safety repair work in UK high rises stated it will 'take far longer than the public expects'. The Guardian reported on the email from a 'senior civil servant' in the Department for Business, Energy and Industrial Strategy (BEIS).The document states repair work on buildings that failed cladding tests'will take far longer than the public expects' due to the 'scale of the task', and'new ideas and skills' will be needed to repair the'vast number' of buildings'in the timely manner expected by the public'.
机译:一份有关英国高层消防安全维修工作的政府文件指出,这将“花费比公众预期更长的时间”。英国《卫报》报道了商业,能源和工业战略部(BEIS)的一名“高级公务员”的电子邮件。该文件指出,由于覆层测试失败,对建筑物的维修工作将比公众预期的时间长得多。需要“任务的规模”和“新的思想和技能”来“及时地修复公众期望的”建筑物的“数量”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号