...
首页> 外文期刊>Fire chief >Snohomish County Fire District 1, Fire Station No. 21
【24h】

Snohomish County Fire District 1, Fire Station No. 21

机译:Snohomish县消防区1,消防局21

获取原文
获取原文并翻译 | 示例
           

摘要

Quicker response capabilities, increased security, uninterrupted response during construction, and retaining existing on-site maintenance facilities - these were just a few of the driving forces of the design for Snohomish County Fire District l's new Fire Station No. 21. The drive-through apparatus bays servernas the central axis for the station, placing design emphasis on surrounding circulation and direct crew response from anywhere in the facility Parking, access and training/meeting rooms are designed to incorporate both secure crew spaces with public "community front-porch" areas.
机译:更快的响应能力,增强的安全性,施工过程中的响应不间断以及保留现有的现场维护设施-这些只是Snohomish County Fire Area l新的21号消防站设计的部分驱动力。设备架位于站的中心轴的服务器旁,将设计重点放在周围的流通上,并从设施中的任何位置直接对机组进行响应停车,进入和培训/会议室的设计旨在将安全的乘员舱与公共“社区前廊”区域合并在一起。

著录项

  • 来源
    《Fire chief》 |2009年第11期|116|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号