首页> 外文期刊>Facilities >Resource budget for workf ace planning in industrial-construction
【24h】

Resource budget for workf ace planning in industrial-construction

机译:工业建筑工作计划的资源预算

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Purpose - The purpose of this paper is to develop a novel analytical approach for workface planning practice in industrial-construction sector such that the construction work package (CWP) resource budget can be sufficiently planned for delivering possible field installation work package (FIWP) schedules with work uncertainty. Design/methodology/approach - The relationship between CWP resource budget and FIWP schedules is first elucidated based on workface planning practice. The literature of work packaging, workface planning and project scheduling is reviewed A novel analytical approach is then developed to quantify CWP resource budget based on a probability theory, in consideration of the probability of occurrence of feasible FIWP schedules formulated based on a resource scheduling approach. The results of case studies given by the new approach are cross validated by using simulation and optimization techniques. Findings - The new analytical approach can assist workface planning by quantifying the expected CWP resource budget to deliver the FIWP work scope with certain activities that are planned at project level and with uncertain activities that are found at workface level. Practical implications - The new analytical approach helps project and workface planners to reliably deploy CWP resource budget for delivering FIWP schedules instead of guessing the budget based on experience. An industrial-construction project for upgrading oil-sands refinery facility is used to show the practical implications. Originality/value - This research develops a new analytical approach for workface planning practice to determine sufficient CWP resource budget for delivering feasible FIWP schedules with work uncertainty.
机译:目的-本文的目的是为工业建筑部门的工作面规划实践开发一种新颖的分析方法,以便可以充分规划建筑工作包(CWP)资源预算,以交付可能的现场安装工作包(FIWP)时间表,工作不确定性。设计/方法/方法-首先根据工作面规划实践阐明CWP资源预算与FIWP进度表之间的关系。回顾了工作包装,工作面计划和项目进度安排的文献,然后开发了一种新颖的分析方法,基于概率理论,考虑了基于资源计划方法制定的可行FIWP计划的发生概率,从而量化了CWP资源预算。新方法给出的案例研究结果通过使用仿真和优化技术得到交叉验证。调查结果-新的分析方法可以通过量化预期的CWP资源预算来协助工作面规划,以提供FIWP工作范围以及在项目级计划的某些活动和在工作面级发现的不确定活动。实际意义-新的分析方法可帮助项目和工作面计划人员可靠地部署CWP资源预算以交付FIWP时间表,而不是根据经验来猜测预算。一个工业建设项目,用于升级油砂炼油厂设施,以展示其实际意义。独创性/价值-这项研究为工作面规划实践开发了一种新的分析方法,以确定足够的CWP资源预算,以提供可行的FIWP时间表(工作不确定)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号