...
首页> 外文期刊>Fabric Architecture >Acoustical fabric updates arts facility in Toronto
【24h】

Acoustical fabric updates arts facility in Toronto

机译:声学面料更新多伦多的艺术设施

获取原文
获取原文并翻译 | 示例

摘要

Built more than 20 years ago, the Toronto Centre for the Arts’ underused main theater neededupdating. The solution involved reducing the overall size and upgrading the systems to create a moreefficient facility.Designers of the retrofit, Diamond Schmitt Architects, brought Eventscape into the project to engineer,fabricate and install over 3,000 sq. ft. of an acoustical backlit panel solution that wrapped the theaterwalls and proscenium. An unusual chevron design of alternating diffusing and reflecting backers withintegrated lighting provides a system that solves both acoustic requirements and allows nearlyunlimited options to create programmable light shows.
机译:建于20多年前的多伦多艺术中心未充分利用的主要剧院需要更新。该解决方案涉及减小整体尺寸和升级系统以创建更高效​​的设施。改造的设计师Diamond Schmitt Architects将Eventscape引入该项目,以设计,制造和安装3,000平方英尺的隔音背光面板解决方案,该解决方案包裹着剧院墙和舞台。集成照明中交替扩散和反射背衬的不寻常人字形设计提供了一种系统,既解决了声学要求,又允许几乎无限的选择来创建可编程的灯光秀。

著录项

  • 来源
    《Fabric Architecture 》 |2018年第3期| 1-3| 共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号