The Impact of Capacity and Location of Multidistributed Generator Integrated in the Distribution System on Electrical Line Losses, Reliability, and Interruption Cost

机译:配电系统中集成的多台分布式发电机的容量和位置对电线损耗,可靠性和中断成本的影响

获取原文
获取原文并翻译 | 示例
           

摘要

The primary purpose of this article is to study the impact of distributed generator (DG) integrated into the distribution system in terms of electrical line losses, reliability and interruption cost. The single- and multi-distributed generators (DG) under this study are connected to a 22 kV distribution system of the Provincial Electricity Authority (PEA) that is a part of Thailand's distribution system. Geographic information systems data, including the lengths of the distribution line and the load locations that are hey parameters of PEA, are simulated using digital simulation and electrical network calculation program (DIgSILENT). In addition, the capacity and location of DG installed into the distribution system are considered. The system average interruption frequency index (SAJFT), the system average interruption duration index (SAIDI) and the interruption cost are assessed as reliability indices by comparing the SAIFI, SAIDI, and interruption cost of the base case (without DG) and the cases of single- and multi-DGs connected to the distribution system. Moreover, the electrical line loss is considered in terms of active power line loss, which is also compared with the base case. The results can be summarized by focusing on the location of DG, the capacity of DG, the number of DG, the size of the load, and the distance to the load, which are factors capable of impacting the electrical line loss, SAIFI, SAIDI, and interruption cost.
机译:本文的主要目的是研究在电力线损耗,可靠性和中断成本方面集成到配电系统中的分布式发电机(DG)的影响。本研究中的单分散和多分散发电机(DG)连接到省电力局(PEA)的22 kV配电系统,该系统是泰国配电系统的一部分。使用数字仿真和电网计算程序(DIgSILENT)对地理信息系统数据(包括配电线路的长度和作为PEA的重要参数的负载位置)进行仿真。此外,还要考虑安装在配电系统中的DG的容量和位置。系统平均中断频率指数(SAJFT),系统平均中断持续时间指数(SAIDI)和中断成本通过比较SAIFI,SAIDI和基本案例(无DG)与以下情况的中断成本来评估为可靠性指标。连接到配电系统的单DG和多DG。此外,根据有功功率线损考虑电气线损,这也与基本情况进行了比较。可以通过关注DG的位置,DG的容量,DG的数量,负载的大小以及到负载的距离等来总结结果,这些是能够影响电线损耗,SAIFI,SAIDI的因素,以及中断费用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号