...
首页> 外文期刊>Environmental Impact Assesment Review >Attention to impact pathways in EISs of large dam projects
【24h】

Attention to impact pathways in EISs of large dam projects

机译:注意大型水坝项目的环境影响评价中的影响途径

获取原文
获取原文并翻译 | 示例
           

摘要

The importance of addressing cumulative environmental impacts in Environmental Impact Statements (EISs) of large development projects is increasingly underlined. However, cumulative impacts are generated through complex impact pathways, involving multiple root causes and lower and higher order effects, interlinked by cause-effect relationships. Consideration to potential impact pathways may thus be difficult without appropriate analytical methods, expertise, and supportive Environmental Impact Assessment guidelines and terms-of-references (TOR). This paper presents the results of an analysis of six EISs prepared for large dam projects between 1994 and 2001. The objective was to analyze if, how, and to what extent potential impact pathways involved in the generation of dam-related cumulative impacts have been addressed in the analyzed material. For this purpose, a theoretical framework was developed, which identifies four key root causes, their potential effects, and associated cause-effect relationships. The analysis revealed various shortcomings. Important imbalances were found in the degree of attention given to effects of different categories. Lower order effects received greater attention than higher order, and the potential effects of reservoir filling were more extensively attended to than those of flow blockage, storage, and regulation. Most importantly, little effort was made to carefully explain the potential impact pathways involved; root causes were often referred to in general terms only, and potential pathways leading up to an anticipated higher order effect or following upon an expected lower order effect were often inadequately addressed or ignored. Probable reasons for the discovered shortcomings are discussed and recommendations are presented for improving the World Bank EIA guidelines for large dam projects.
机译:越来越强调在大型开发项目的环境影响声明(EIS)中解决累积环境影响的重要性。但是,累积影响是通过复杂的影响途径产生的,涉及多个根本原因以及由因果关系相互联系的较低和较高顺序的影响。因此,如果没有适当的分析方法,专业知识以及支持性的环境影响评估指南和职权范围,则可能难以考虑潜在的影响途径。本文介绍了对1994年至2001年为大型水坝项目准备的六个EIS的分析结果。目标是分析是否,如何以及在多大程度上解决了与大坝相关的累积影响的潜在影响途径。在分析的材料中。为此,开发了一个理论框架,该框架确定了四个关键的根本原因,它们的潜在影响以及相关的因果关系。分析显示出各种缺点。在对不同类别影响的关注程度上发现了重要的失衡。与高阶相比,低阶效应引起了更多的关注,并且与流动阻塞,储存和调节相比,更广泛地关注了储层充填的潜在效应。最重要的是,几乎没有做出任何努力来仔细解释所涉及的潜在影响途径。根本原因通常仅用笼统的术语来提及,导致潜在的预期高阶效应或跟随预期的低阶效应的潜在途径常常没有得到适当解决或忽略。讨论了所发现缺点的可能原因,并提出了改善世界银行大坝项目环境影响评估指南的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号