首页> 外文期刊>Environmental Impact Assesment Review >Assessing environmental vulnerability in EIA-The content and context of the vulnerability concept in an alternative approach to standard EIA procedure
【24h】

Assessing environmental vulnerability in EIA-The content and context of the vulnerability concept in an alternative approach to standard EIA procedure

机译:评估环境影响评估中的环境脆弱性-标准环境影响评估程序的替代方法中脆弱性概念的内容和背景

获取原文
获取原文并翻译 | 示例
       

摘要

In the traditional EIA procedure environmental vulnerability is only considered to a minor extent in the early stages when project alternatives are worked out. In Norway, an alternative approach to EIA, an integrated vulnerability model (IVM), emphasising environmental vulnerability and alternatives development in the early stages of EIA, has been tried out in a few pilot cases. This paper examines the content and use of the vulnerability concept in the IVM approach, and discusses the concept in an EIA context. The vulnerability concept is best suited to overview analyses and large scale spatial considerations. The concept is particularly useful in the early stages of EIA when alternatives are designed and screened. By introducing analyses of environmental vulnerability at the start of the EIA process, the environment can be a more decisive issue for the creation of project alternatives as well as improving the basis for scoping. Vulnerability and value aspects should be considered as separate dimensions. There is a need to operate with a specification between general and specific vulnerability. The concept of environmental vulnerability has proven useful in a wide range of disciplines. Different disciplines have different lengths of experience regarding vulnerability. In disciplines such as landscape planning and hydrogeology we find elements suitable as cornerstones in the further development of an interdisciplinary methodology. Further development of vulnerability criteria in different disciplines and increased public involvement in the early stages of EIA are recommended.
机译:在传统的环境影响评估程序中,在制定项目替代方案的早期阶段,仅在较小程度上考虑了环境脆弱性。在挪威,已经在一些试点案例中尝试了一种替代环境影响评估的方法,即综合脆弱性模型(IVM),该模型强调了环境影响评估早期阶段的环境脆弱性和替代方案的开发。本文研究了IVM方法中漏洞概念的内容和使用,并在EIA环境中讨论了该概念。漏洞概念最适合概述分析和大规模空间考虑。在设计和筛选替代方案时,该概念在EIA的早期阶段特别有用。通过在EIA流程开始时引入对环境脆弱性的分析,对于创建项目替代方案以及改善范围界定的基础,环境可能是更具决定性的问题。脆弱性和价值方面应视为单独的维度。需要在一般漏洞和特定漏洞之间使用规范进行操作。事实证明,环境脆弱性的概念在许多学科中都是有用的。不同学科对脆弱性的经验长度不同。在景观规划和水文地质学等学科中,我们发现适合作为跨学科方法论进一步发展的基石的要素。建议在不同学科中进一步制定脆弱性标准,并在EIA的早期阶段增加公众的参与。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号