Development of a long-term wellbore sealing concept based on numerical simulations and in situ-testing in the Altmark natural gas field

机译:基于数值模拟和Altmark天然气田的现场测试开发长期井眼密封概念

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents an innovative well abandonment concept developed for the long-term containment of CO_2 in depleted Rotliegend gas reservoirs. The new concept aims at amending the conventional standard well abandonment procedure, taking advantage of the natural creeping ability of the thick, homogeneous Zechstein rock salt formation located around 3,000 m in depth (Altmark area) and consists of four main sealing units: (1) a standard sealing element with cement from the reservoir to the impermeable caprock, (2) a salt plug created in the formerly reamed section of casing within the plastic Zechstein (Upper Permian) rock salt formation, (3) two bridge plugs at the bottom and top of the salt plug and (4) a standard sealing element with cement from the top bridge plug until the ground surface. This site-specific study mainly lays emphasis on the development and field testing of the naturally created salt plug, as a key component of the long-term wellbore sealing concept. Comprehensive numerical simulations conducted prior to and during the field test in 2010 and 2011 successfully predicted the evolution of convergence using downhole measurement data. Preliminary results comprise (1) proven convergence of the rock salt formation, (2) a successful coring and (3) restored integrity of Zechstein salt formation, as proven by the formation integrity test. Based on these results, the new long-term sealing concept has been successfully tested at the Altmark natural gas field and successful application of the concept on other sites with similar geological conditions is foreseen to be likely.
机译:本文提出了一种创新的废弃井概念,该废弃井概念是为枯竭的Rotliegend气藏中的CO_2的长期控制而开发的。新概念旨在通过利用厚的均质的Zechstein岩盐地层的自然蠕变能力来修改常规的标准弃井程序,该地层深度约3,000 m(Altmark区域),由四个主要密封单元组成:(1)一个标准的密封元件,用水泥从储层到不渗透的盖层,(2)在塑料的Zechstein(上二叠纪)岩盐地层的先前扩孔的套管段中形成了一个盐塞,(3)底部的两个桥塞和盐塞的顶部;以及(4)从顶部桥塞一直到地面的水泥密封件。这项针对特定地点的研究主要侧重于天然形成的盐塞的开发和现场测试,这是长期井眼密封概念的关键组成部分。在2010年和2011年现场测试之前和期间进行的全面数值模拟使用井下测量数据成功预测了收敛的演变。初步结果包括(1)岩盐地层的已证实收敛,(2)成功取芯和(3)Zechstein盐地层的恢复完整性,这已通过地层完整性测试证明。基于这些结果,新的长期密封概念已在Altmark天然气田得到了成功测试,并且有望在具有类似地质条件的其他地点成功应用。

著录项

  • 来源
    《Environmental earth sciences》 |2012年第2期|p.395-409|共15页
  • 作者单位

    Clausthal University of Technology (TUC), Clausthal-Zelletfeld/ Energie-Forschungszentrum Niedersachsen, Goslar, Germany,Institute of Petroleum Engineering, Clausthal University of Technology, Agricolastr. 10, 38678 Clausthal-Zellerfeld, Germany;

    Clausthal University of Technology (TUC), Clausthal-Zelletfeld/ Energie-Forschungszentrum Niedersachsen, Goslar, Germany,Institute of Petroleum Engineering, Clausthal University of Technology, Agricolastr. 10, 38678 Clausthal-Zellerfeld, Germany;

    GDF SUEZ E&P Deutschland GmbH, Lingen, Germany;

    GDF SUEZ E&P Deutschland GmbH, Lingen, Germany;

    GDF SUEZ E&P Deutschland GmbH, Lingen, Germany;

    Clausthal University of Technology (TUC), Clausthal-Zelletfeld/ Energie-Forschungszentrum Niedersachsen, Goslar, Germany,Institute of Petroleum Engineering, Clausthal University of Technology, Agricolastr. 10, 38678 Clausthal-Zellerfeld, Germany;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    long-term sealing; well abandonment; rock salt barrier; salt plug; wellbore convergence; numerical simulation;