...
首页> 外文期刊>Environment reporter >Renewed License for Dams Requires Monitoring Spokane River for Toxics
【24h】

Renewed License for Dams Requires Monitoring Spokane River for Toxics

机译:大坝的新许可证要求对斯波坎河进行毒物监测

获取原文
获取原文并翻译 | 示例

摘要

A renewed federal license issued June 18 for five hydroelectric dams on the Spokane River requires dam owner Avista Corp. to check specific sediments for the presence of toxic chemicals, participate in improving water quality in the river and Lake Spokane, and protect habitat of the federally listed bull trout.rnThe environmental conditions are part of Avista's 50-year operating license issued by the Federal Energy Regulatory Commission for the utility's continued operation of the five dams on its Spokane River Project, the company said June 18 in a statement.
机译:斯波坎河上的五个水电大坝的6月18日颁发的新联邦许可证要求大坝所有者Avista Corp.检查特定的沉积物中是否含有有毒化学物质,参与改善河中和斯波坎湖的水质,并保护联邦政府的栖息地。该公司6月18日在一份声明中说,环境条件是联邦能源监管委员会为该公用事业公司在斯波坎河项目上的五个水坝的持续运营而颁发的Avista 50年经营许可证的一部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号