...
首页> 外文期刊>Environment reporter >South Carolina Utility Plans to Retire Six Older Fossil Fuel-Fired Generating Units
【24h】

South Carolina Utility Plans to Retire Six Older Fossil Fuel-Fired Generating Units

机译:南卡罗来纳州公用事业计划淘汰六台较旧的化石燃料发电机组

获取原文
获取原文并翻译 | 示例

摘要

Santee Cooper, an electric power utility operated by South Carolina, plans to retire six generating units at its two oldest facilities, a spokeswoman for the company told BNA Oct. 22. According to Mollie Gore, recent regulations issued by the Environmental Protection Agency to control mercury and air toxics were a primary driver for the utility's decision. Installing the necessary technology "would be cost-prohibitive," Gore said. "We can get by" without their generating capacity until a nuclear facility comes on line. The closures involve four coal-fired generating units and two oil-fired units, representing a total electrical generating capacity of 568 megawatts. Two of the coal-fired units, which began generating in the 1970s, and the two oil-fired units, which date back to 1954, are located at Santee Cooper's Jefferies Generating Station in Moncks Corner, S.C., according to Gore. She said no date has been set for those units to cease operation.
机译:南卡罗来纳州的一家电力公司Santee Cooper计划于10月22日向BNA透露,将在其两个最老的设施中淘汰6台发电机组。据莫利·戈尔(Mollie Gore)称,环境保护署发布了最新法规以控制汞和空气中的有毒物质是该公司决定的主要驱动力。戈尔说,安装必要的技术“将抑制成本”。没有它们的发电能力,“我们可以通过”,直到核设施投产。封锁涉及四台燃煤发电机组和两台燃油发电机组,总发电量为568兆瓦。根据戈尔的说法,其中两个燃煤机组始于1970年代,而两个燃煤机组可追溯至1954年,位于南卡罗来纳州Moncks Corner的Santee Cooper的Jefferies发电站。她说,尚未确定这些单位停止运营的日期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号