...
首页> 外文期刊>Environment reporter >Ohio Air National Guard Will Not Build Wind Turbine After Lawsuit Threatened
【24h】

Ohio Air National Guard Will Not Build Wind Turbine After Lawsuit Threatened

机译:诉讼受到威胁后,俄亥俄州航空国民警卫队将不会建造风力涡轮机

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

After conservation groups began mounting an Endangered Species Act lawsuit, the Ohio Air National Guard has decided not to build a wind turbine along the shores of Lake Erie that could endanger migrating birds. The American Bird Conservancy and the Black Swamp Bird Conservancy said Jan. 29 that the project has been halted, citing a letter to their attorney written by Col. Peter Sartori, installations and mission support director for Camp Perry near Port Clinton, Ohio. Sartori said the turbine project "will not go forward at this time" because of objections raised by the groups about its impact on one of the largest bird migration corridors in North America. Earlier in January, attorney William S. Eubanks Ⅱ sent the guard a "notice of intent to sue" letter on behalf of the groups (45 ER 112, 1/10/14).
机译:在保护组织开始提起《濒危物种法》诉讼后,俄亥俄州航空国民警卫队决定不沿伊利湖沿岸建造可能危害迁徙鸟类的风力发电机。美国鸟类保护协会和黑沼泽鸟类保护协会于1月29日表示,该项目已被终止,理由是一封信由彼得·萨尔托里上校致信。萨托里说,该涡轮机项目“目前不会进行”,因为这些团体对它对北美最大的鸟类迁徙走廊之一的影响提出了反对意见。 1月初,律师William S. EubanksⅡ代表团体向卫兵发出了“起诉意向书”(45 ER 112,1 / 10/14)。

著录项

  • 来源
    《Environment reporter》 |2014年第5期|308-308|共1页
  • 作者

    Bebe Raupe;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号