首页> 外文期刊>Environment reporter federal >Corps Of Engineers Notice On Issuance Of Nationwide Permits
【24h】

Corps Of Engineers Notice On Issuance Of Nationwide Permits

机译:工程师团关于发放全国许可证的通知

获取原文
获取原文并翻译 | 示例
           

摘要

1. Aids to Navigation. The placement of aids to navigation and regulatory markers which are approved by and installed in accordance with the requirements of the U.S. Coast Guard (see 33 CFR, chapter 1, sub-chapter C, part 66). (Section 10)rn2. Structures in Artificial Canals. Structures constructed in artificial canals within principally residential developments where the connection of the canal to a navigable water of the United States has been previously authorized (see 33 CFR 322.5(g)). (Section 10)rn3. Maintenance.rn(a) The repair, rehabilitation, or replacement of any previously authorized, currently serviceable, structure, or fill, or of any currently serviceable structure or fill authorized by 33 CFR 330.3, provided that the structure or fill is not to be put to uses differing from those uses specified or contemplated for it in the original permit or the most recently authorized modification. Minor deviations in the structure's configuration or tilled area, including those due to changes in materials, construction techniques, or current construction codes or safety standards that are necessary to make the repair, rehabilitation, or replacement are authorized. This NWP authorizes the repair, rehabilitation, or replacement of those structures or fills destroyed or damaged by storms, floods, fire or other discrete events, provided the repair, rehabilitation, or replacement is commenced, or is under contract to commence, within two years of the date of their destruction or damage. In cases of catastrophic events, such as hurricanes or tornadoes, this two-year limit may be waived by the district engineer, provided the permittee can demonstrate funding, contract, or other similar delays.
机译:1.导航辅助。经美国海岸警卫队批准并根据美国海岸警卫队要求安装的导航和管制标记辅助工具的放置(请参阅33 CFR,第1章,C章,第66部分)。 (第10节)rn2。人工运河的结构。事先已授权将运河与美国通航水连接的建筑物,主要是住宅区内的人工运河中建造的结构(请参见33 CFR 322.5(g))。 (第10节)rn3。维护。(a)对任何先前授权的,当前可维修的结构或填充物,或33 CFR 330.3授权的任何当前可维修的结构或填充物进行维修,修复或更换,但前提是该结构或填充物不得用于与原始许可证或最新授权的修改中指定或预期使用的用途不同的用途。允许对结构的构型或耕作区进行细微的偏差,包括由于材料,施工技术或当前的施工规范或安全标准的更改而引起的偏差,这些偏差是进行维修,修复或更换所必需的。本NWP授权在两年内开始,或根据合同规定开始维修或修复的情况下,对因暴风雨,洪水,火灾或其他离散事件而破坏或损坏的那些结构或填充物进行维修,修复或更换。销毁或损坏日期的日期。如果发生灾难性事件,例如飓风或龙卷风,只要持证人可以证明资金,合同或其他类似的延误,区域工程师可以免除该两年的限制。

著录项

  • 来源
    《Environment reporter federal》 |2008年第1364期|1418-1437|共20页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号