首页> 外文期刊>Environment reporter - Cases >Idaho Conservation League v. Bonneville Power Admin
【24h】

Idaho Conservation League v. Bonneville Power Admin

机译:爱达荷州自然保护联盟诉Bonneville权力管理员

获取原文
获取原文并翻译 | 示例
           

摘要

Bonneville Power Administration did not act arbitrarily or capriciously in preparing National Environmental Policy Act environmental assessment for dam operation change, because: (1) EA adequately discusses no-action and preferred alternatives and was not required to discuss proposed mitigation and monitoring alternative that it rejected as it already engages in mitigation and monitoring at dam, and (2) EA adequately assessed impacts of potential erosion and invasive species from operation change.
机译:邦纳维尔电力局在为大坝运营变更准备《国家环境政策法》环境评估时没有采取任意行动,因为:(1)EA充分讨论了不采取任何行动和首选替代方案,不需要EA讨论拟议的缓解措施和监测其拒绝的替代方案因为它已经在大坝上进行了缓解和监测,并且(2)EA充分评估了运营变更对潜在侵蚀和入侵物种的影响。

著录项

  • 来源
    《Environment reporter - Cases》 |2016年第17期|1793-1795|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号