首页> 外文期刊>SB >Simple Transition
【24h】

Simple Transition

机译:简单过渡

获取原文
获取原文并翻译 | 示例
           

摘要

The new permitting regulations now apply to all operations and facilities that were covered by the old pollution and waste regimes. Steve Butler leads you, step by step, through the new framework, which, he says, has simplified and standardised regulation mechanics.rnOn 6 April 2008 the Environmental Permitting (England & Wales) Regulations 2007 came into force in the UK.rnThese regulations apply to all operations and facilities regulated under either the pollution prevention and control (PPC) regime (part A1, A2 and part B permitted installations) or the waste management licensing (WML) regime.rnThe aim of the new framework is not to change who or what is regulated, but to simplify and standardise the mechanics of regulation through the development of a single permitting and compliance system, which can also target resources where they are needed the most - that is, adopts a risk-based approach.
机译:现在,新的许可法规适用于旧的污染和废物制度所涵盖的所有运营和设施。史蒂夫·巴特勒(Steve Butler)逐步引导您完成新框架,他说,该框架简化了标准化的法规机制。rn2008年4月6日,《 2007年环境许可(英格兰和威尔士)法规》在英国生效。适用于受污染预防和控制(PPC)体制(A1,A2和B部分许可的装置)或废物管理许可(WML)体制管制的所有运营和设施。新框架的目的不是改变谁或什么是受监管的,而是通过开发单一的许可和遵守系统来简化和标准化监管机制,该系统还可以将资源用于最需要的资源,即采用基于风险的方法。

著录项

  • 来源
    《SB》 |2008年第141期|22-23|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号