首页> 外文期刊>Inside EPA's environmental policy alert >DC PERMIT DISPUTE REVIVES DEBATE OVER CSO COMPLIANCE SCHEDULES
【24h】

DC PERMIT DISPUTE REVIVES DEBATE OVER CSO COMPLIANCE SCHEDULES

机译:DC许可纠纷在CSO合规时间表上进行辩论

获取原文
获取原文并翻译 | 示例
       

摘要

In an effort that could set a national precedent, the Washington, DC, wastewater treatment authority is appealing an EPA discharge permit, seeking to include a compliance schedule for reducing combined sewer overflows (CSOs) in the permit providing a "permit shield" against citizen suits.rnAt issue is whether EPA can and should include compliance schedules of long-term control plans (LTCPs) in National Pollutant Discharge Elimination System (NPDES) permits, when current regulations only require the agency to include them in enforcement consent decrees.
机译:为了树立全国先例,华盛顿特区的废水处理当局正在呼吁EPA排放许可证,寻求在许可证中包括减少合计下水道溢流(CSO)的合规时间表,从而为公民提供“许可证保护”问题是,EPA是否可以并且应该在国家污染物排放消除系统(NPDES)许可中包括长期控制计划(LTCP)的遵守时间表,而现行法规仅要求该机构将其纳入执法同意法令中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号