首页> 外文期刊>Inside EPA's environmental policy alert >States Eye 'Post-Construction' Rule To Resolve Stormwater Problems
【24h】

States Eye 'Post-Construction' Rule To Resolve Stormwater Problems

机译:美国关注“施工后”规则以解决雨水问题

获取原文
获取原文并翻译 | 示例
           

摘要

State water quality officials are praising the expected broad scope of EPA's planned "post-construction" stormwater rule, saying they hope the rule will resolve long-standing problems with the current stormwater program, while industry officials say the rule's breadth could include a wider range of costly controls than previously thought.rnEPA Dec. 17 floated several options for the post-construction rule that include modifying large segments of the current stormwater program, such as expanding the area currently covered by municipal stormwater permits, developing national standards for stormwater control similar to those in a recent guidance for federal facilities, and developing a single set of requirements for both large and small municipal stormwater systems.
机译:州水质官员对EPA计划的“建设后”雨水法规的预期范围广泛表示赞赏,称他们希望该法规将解决当前雨水计划长期存在的问题,而行业官员表示该法规的广度可能包括更广泛的范围EPA于12月17日对施工后规则提出了若干选择,其中包括修改当前雨水计划的大部分内容,例如扩大目前市政雨水许可证所覆盖的区域,制定类似的国家雨水控制标准针对最近针对联邦设施的指南中的要求,并针对大型和小型市政雨水系统制定一套要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号