首页> 外文期刊>Inside EPA's environmental policy alert >EPA Faces Suit Over 'Unreasonable' Delay Issuing GHG Rules For Utilities
【24h】

EPA Faces Suit Over 'Unreasonable' Delay Issuing GHG Rules For Utilities

机译:EPA因公用事业温室气体排放规则“不合理”延误而面临诉讼

获取原文
获取原文并翻译 | 示例
       

摘要

Environmentalists and states are threatening to sue EPA alleging "unreasonable" delays in finalizing a greenhouse gas (GHG) new source performance standard (NSPS) for newly constructed utilities and developing a proposed NSPS for existing facilities, while EPA says it continues to review millions of comments on the new power plant rulemaking. Sierra Club, Environmental Defense Club and the Natural Resources Defense Council (NRDC) filed an April 15 notice of intent (NOT) to sue with EPA - two days after the agency missed a one-year Clean Air Act deadline to finalize its April 13, 2012, proposed NSPS for new power plants. EPA's publication of the proposal in the Federal Register triggered the one-year clock for the agency to formally issue the final version of the climate rule. Relevant documents are available on InsideEPA.com. See page 2 for details.
机译:环保主义者和各州威胁要起诉EPA,指称在为新建公用事业最终确定温室气体(GHG)新源性能标准(NSPS)和为现有设施制定拟议的NSPS方面存在“不合理”的延误,而EPA表示将继续审查数以百万计的对新电厂法规的评论。塞拉俱乐部,环境保护俱乐部和自然资源保护委员会(NRDC)于4月15日向美国环保署提起了诉讼意向书(NOT)-在该机构错过了为期一年的《清洁空气法案》的最后期限以最终确定其4月13日后, 2012年,为新电厂提出了NSPS。 EPA在联邦公报上发布了该提案,触发了该机构一年正式发布气候规则最终版本的时钟。有关文件可在InsideEPA.com上找到。有关详细信息,请参见第2页。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号