首页> 外文期刊>Inside EPA's environmental policy alert >Environmentalists Say State Ash Cleanup Plan Does Not Block RCRA Suit
【24h】

Environmentalists Say State Ash Cleanup Plan Does Not Block RCRA Suit

机译:环保主义者说州灰清理计划不会阻止RCRA诉讼

获取原文
获取原文并翻译 | 示例
           

摘要

Environmentalists are urging an appeals court to let them sue over leaks from a Kentucky coal ash site even though it is under a state-crafted "corrective action plan," arguing that because the state's plan is inadequate it should not block their Resource Conservation and Recovery Act (RCRA) suit or related Clean Water Act (CWA) claims.In their March 27 opening brief, environmental appellants in Kentucky Waterways Alliance (KWA), et al., v. Kentucky Utilities Co. (KU) say a district judge was wrong to dismiss their RCRA claims of an "imminent and substantial endangerment" (ISE) from leaks at KU's E.W. Brown power plant in Mercer County, KY. The judge said the plaintiffs lacked standing because the state had already approved a corrective action plan aimed at controlling pollution from the plant.
机译:环保主义者敦促上诉法院允许他们起诉肯塔基州煤灰场的泄漏,即使该泄漏是根据州制定的“纠正措施计划”制定的,他们认为,由于该州的计划不充分,因此不应阻止其资源节约 r n在3月27日的开幕式摘要中,肯塔基州水道联盟(KWA)等人诉肯塔基州公用事业公司(KU)的环境上诉案。一名地区法官说,驳回他们的RCRA关于“迫在眉睫的重大危险”(ISE)的索赔是错误的,该索赔来自肯塔基州Mercer县KU的EW布朗发电厂的泄漏。法官说,原告人缺乏资格,因为该州已经批准了旨在控制工厂污染的纠正措施计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号